What it costs
Almost nobody in this trade publishes a price. We would rather you had some idea where you stand before you ring anyone. So here is how we price, and what moves it.
How we price
Day rate
£600 a dayThe two of us, or £300 if it’s one of us.
Brickwork
from £60 a square metreBlockwork
from £20 a square metreRepointing
from £50 a square metreDecorative, radius and intricate
from £600 a dayPriced by the day, because the detail sets the time and not the area. A curved wall takes around double the time of the same wall run straight, and a decorative bond is 30 to 50 per cent on top of plain facing work. Send us a photograph or a drawing and we’ll tell you how many days it’s likely to take.
The anatomy of a quote
Every price we write down comes in parts, so here is one drawn as the parts it is made of. This is a ten square metre garden wall in plain facing brick:
- Laying, 600 bricks at £1
- Bricks delivered, 600 × 75p, plus 10 per cent
- Mortar, DPC and ties, plus 10 per cent: £132
That is £1,227 for the wall itself.
On top of that comes your site: the footing, the piers, the coping, how far the materials get barrowed. That is the part no website can price, so we do it with a tape measure. Ring us or send a photo.
What moves the price
- The size of the job, and whether it is one wall or a whole garden.
- Ground and access. What’s under the footing, how far the materials have to be carried, and whether a lorry can get to the gate. On a wall this is the biggest single variable there’s, and the one nobody can price from a photograph.
- Height. Anything above a single storey usually means scaffolding or a tower, which is a real cost and not a line we pad.
- How much has to be cut out and replaced, whether that’s raking joints out to a proper depth or replacing bricks that have blown.
- The materials. A handmade or reclaimed brick costs several times a machine one, and stone more again.
- Detail. Piers, copings, arches, curves and banding all take longer per brick than straight running wall, because every unit gets set out and often cut.
- The mortar, if the mix has to be matched to an old wall and made in small batches.
What’s included, and what isn’t
- Included on the laying rates: the labour, the setting out, the finishing, the clean-up, and the written price with the work broken down.
- On the day rate: labour, tools and travel. Mortar and materials we buy are charged at cost plus 10 per cent.
- Not included unless we say so: scaffolding, skips, and any hidden repair we find once the wall is opened up.
- If we find something nobody could have known about, we stop and tell you before it costs you anything.